Venus I
Galvanized Bucket Elevator

Height

HP

Head Shaft

Wt.

30

7.5

2 7/16”

2614

35

7.5

2 7/16”

2782

40

7.5

2 7/16”

2949

45

10

2 7/16”

3132

50

10

2 7/16”

3297

55

10

2 7/16”

3480

60

15

2 15/16”

3643

65

15

2 15/16”

3824

70

15

2 15/16”

3991

75

15

2 15/16”

4138

80

15

2 15/16”

4460

85

15

2 15/16”

4641

90

15

2 15/16”

4808

95

15

2 15/16”

4992

100

20

2 15/16”

5159

105

20

2 15/16”

5343

110

20

2 15/16”

5509

115

20

2 15/16”

5699

120

20

2 15/16”

5870

125

20

2 15/16”

6055

130

20

2 15/16”

6221

135

20

2 15/16”

6411

140

25

3 7/16”

6577

145

25

3 7/16”

6764

150

25

3 7/16”

6927

155

25

3 7/16”

9007

160

25

3 7/16”

9242

165

25

3 7/16”

9473

170

25

3 7/16”

9700

175

25

3 7/16”

9936

180

25

3 7/16”

10166

185

30

3 7/16”

10391

190

30

3 7/16”

10616

195

30

3 7/16”

10855

200

30

3 7/16”

11087

 

Venus - Class I Steady load not exceeding Motor HP rating and light shock loads during 10 hours a day. Moderate shock loads are allowable if operation is intermittent. Drive at 65 RPM Revolutions Per Minute

HP

 Part Number

Wt.

7.5

VN07325

137

10

VN10325

137

15

VN15425

165

20

VN20525

217

25

VN25525

217

30

VN30625

294

Venus- Class II Steady load not exceeding Motor HP rating for over 10 hours a day. Moderate shock loads are allowable during 10 hours a day. Drive at 65 RPM

7.5

VN07325

137

10

VN10425

165

15

VN15525

217

20

VN20625

294

25

VN25625

294

30

VN30625

294

DRIVE PRICES INCLUDE: Reducer, belts, sheaves, bushings, belt guard and fan cooler (F) where required, less motor.

CAPACITY

BPH Bushels Per Hour - a US measure of volume.

CFH Cubic Feet per Hour, equal to 0.02832 cubic meter.

TPH Tons per Hour

MTPH Metric Tons per Hour

3150

3938

94

86

STANDARD FEATURES:
  • 510 FPM Feet Per Minute belt speed, 65 pulley RPM

  • 9 x 6 plastic buckets on 8" centers, with bucket bolts

  • 10" wide pre-punched PVC Polyvinylchloride belt, 250 PIW Pounds per Inch Width, a standard measure of the strength of belting. through 135’, 350 PIW on taller elevators.

  • 12 ga. Head section with Dodge SCM pillow block ball bearings through 2 15/16” dia., Dodge S2000 double roller bearings on larger sizes, bearing jacking bolts, 30" diameter drum head pulley with slide lagging, throat baffle, inspection door at discharge, lagging inspection door, two-piece bonnet, 10 ga. steel liner at wear points, and motor mount.

  • 14" wide x 10" deep 14 ga. Galvanized dual legging.  Above 150’ legging is 12 ga. bolted. Inspection door section with full width x 4' tall openings on front and back side.

  • 10 ga. three-piece sides, bolted boot section with 1 15/16" diameter Dodge SCM pillow block ball bearings, screw take-up, 30" diameter drum boot pulley, inspection door, two clean-out slides, and one boot hopper.

 

Prices below added to base leg price.

Accessories

Wt.

Service Platform

635

Distributor Platform

310

Intermediate Platform

140

1/4” Urethane Lined Head

30

Head Explosion Vent

42

Atmospheric Vent

8

Extra Boot Hopper

32

Guy Bracket

17

12 Ga. Galvanized Legging

13/ft

Gravity Boot Take-up

255

Winged Boot Pulley

40

Boot Clean Out Pan

75

Self Cleaning Boot

 

14 Ga. Non Std. Discharge Height

38/ft

2 7/16" Roller Head Bearings

26

2 15/16” Roller Head Bearings

40

1/4" Urethane Lined Discharge Transition To 10" Dia.

 

52

Discharge Transition To 8" Dia.

33

Discharge Transition To 10" Dia.

36

 

SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE.

Riley Equipment, Inc. - Vincennes, IN

11 - 06/01